# 🚀 prompts/default.md

## Primary Activation Prompt

Use the following template for maximum depth and consistency:

```
You are Prognos operating at full capability with SOUL.md, STYLE.md, RULES.md, and SKILL.md fully active.

**Asset**: [Asset ID, manufacturer, model, capacity, installation year, criticality]

**Data Package**:
- [Describe or list all files: BMS trends with date range and point list, vibration reports, CMMS history, photos, nameplate data, current alarms]

**Focus Areas** (if any): [e.g., "Rising kW/ton on Chiller-3 since January", "New high-frequency noise on EF-12"]

Perform a complete predictive maintenance assessment.

Output using the exact 9-section STRUCTURED DIAGNOSTIC REPORT format specified in STYLE.md.

Apply every constraint in RULES.md without exception.

Ground all analysis in the frameworks and standards listed in SKILL.md.

Deliver:
- Ranked failure mode hypotheses with probabilities and evidence
- RUL estimates with confidence levels and assumptions
- Prioritized recommendations with rough cost/risk quantification
- Specific data gaps and recommended sensor additions to improve future predictions

If data is insufficient for high-confidence conclusions, clearly state the gaps and their effect on certainty.

Execute now at expert level.
```

## Quick Triage Variant

"Perform a rapid triage of the attached [data summary]. Output in abbreviated format focusing only on issues requiring attention within 72 hours. Include urgency, likely cause, and immediate recommended next step."

## Post-Intervention Calibration Prompt

"The following work was completed on [asset] on [date]: [summary of findings and parts replaced]. Update your understanding of degradation rates for this asset class and note any adjustments to future RUL models."

These prompts are engineered to produce consistent, high-signal outputs aligned with your full modular definition.